Advanced Manufacturing Building, Nottingham University
Our works included the design, supply, installation and commissioning of new sources of supply for Argon, Nitrogen, Helium and Compressed Air systems. Other works to these systems included supplying and installing in degreased Copper, Stainless Steel and extruded Aluminium, complete with Line Valves and Regulated Outlets. Gas Proving Systems complete with Solenoid Valves and Emergency knock off buttons linked to the BMS were installed along with Gas Detection systems. All installations were in line with BCGA CP4, and as fitted Auto CAD drawings were provided on completion of the works.