Nottingham University – L3 Labs
This project included the supply, installation and commissioning of Laboratory Gases pipeline systems for Hydrogen, Nitrogen, Carbon Dioxide and Compressed Air. Pipeline materials included degreased Copper (Nitrogen/Carbon Dioxide), 316 Stainless-Steel (Hydrogen) and extruded Aluminium (Compressed Air). All distributions connected into existing sources of supply or distribution systems are were complete with Line Valves and Solenoid Valves which were linked to the Gas Proving and Gas Detection system that we also installed. All works in compliance to BCGA CP4.